Home / Projects / Akshara Aditya Homes
Aditya Nagar · Adibatla · Inside ORR · TG-bPASS Approved

Akshara Aditya Homes

Premium 2 BHK homes from 1150–1325 sq.ft with only three homes per floor — a new-age community with nature at its heart, 3.5 km from TCS Adibatla. Structure complete, finishing underway.

2 BHK
Configuration
1150–1325
Sq.ft · 3 plan options
Stilt + 5
Only 3 homes per floor
North & East
Vaastu-aligned facings
Structure ✓
Topped out · Finishing on
Akshara Aditya Homes — architect's render
Architect's render — as designed
Ongoing · Structure Topped Out

A new-age community with nature at its heart.

Akshara Aditya Homes brings the Subham quality system to a full apartment community: Stilt + 5 floors with only three 2 BHK homes per floor, a rooftop garden retreat, sewage treatment plant, EV charging and solar-ready wiring — all inside the Outer Ring Road at Adibatla, 3.5 km from TCS. A project supported by BNI Akshara, with Vastu curated by Dr. Venugopal Rao Veeramneni.

Why buyers shortlist this project

Privacy of just 3 homes per floor in a full lift community · A documented quality system — M25 concrete, tested slab by slab, reports you can read · Adibatla's growth curve: TCS at 3.5 km, Foxconn nearby, inside ORR — buy before the finishing stage prices it like a finished home.

Highlights

Only 3 Flats Per Floor Rooftop Garden, Yoga Space & Cabana EV Charging in Parking Solar Net-Metering Pre-Wired Sewage Treatment Plant (STP) Rainwater Harvesting Vaastu-Curated Design 24/7 Gated Security 4-Passenger Lift Car Wash Point

Project Snapshot

Configuration2 BHK · 1150 / 1305 / 1325 sq.ft
StructureStilt + 5 floors · 3 flats per floor
FacingNorth & East facing homes
ApprovalTG-bPASS Permit 0001/BP/3131/2025
PlotLRS-approved, Aditya Nagar, Adibatla
RERAApproval awaited
StatusStructure complete · Finishing underway
📞  Call Now WhatsApp: Site Visit Brochure (PDF)

Site visits daily 10 AM – 6 PM.
We reply on WhatsApp within the hour.

Apartment Layouts

Pick the plan that fits your family.

Real 3D layouts with every room marked — first the complete floor plate, then each of the three homes. Tap any plan to zoom in.

Master Floor Plan

The Full Floor Plate

3 homes per floor · complete slab
☀ 1305 N · 1325 N · 1150 E

The entire slab, exactly as it will be built — three 2 BHK homes arranged so every home gets outside light on at least two sides. Just one lift and one staircase serve three families per floor.

One lift + one staircase Only 3 flats per floor No shared walls between living areas Light & cross-ventilation on all sides
Get Cost Sheet on WhatsApp
Unit 1

2 BHK · North Facing

1305 sq.ft
☀ North facing

The larger north-facing home — a wide living-dining sweep, a balcony off the living area, and a utility tucked behind the kitchen.

Living area Dining Master bedroom Kids bedroom Kitchen Utility 2 bathrooms Balcony
Get Cost Sheet on WhatsApp
Unit 2

2 BHK · North Facing

1325 sq.ft
☀ North facing

The largest home on the floor. Same room mix as Unit 1 with a touch more width in the bedrooms and balcony.

Living area Dining Master bedroom Kids bedroom Kitchen Utility 2 bathrooms Balcony
Get Cost Sheet on WhatsApp
Unit 3

2 BHK · East Facing

1150 sq.ft
☀ East facing

The east-facing home beside the lift and staircase — morning sun in the living area, and the most efficient of the three plans.

Living area Dining Master bedroom Kids bedroom Kitchen Utility 2 bathrooms Balcony
Get Cost Sheet on WhatsApp
Community Amenities

Small community. Big-project comforts.

Fifteen homes share amenities usually reserved for large gated projects — each one photographed from our specification, not imagined.

Rooftop Garden & Cabana — Akshara Aditya Homes

Rooftop Garden & Cabana

A curated rooftop retreat — yoga space, party lawn and cabana for evenings above the city.

Solar Power-Ready — Akshara Aditya Homes

Solar Power-Ready

Net-metering wiring pre-installed, so your electricity bill can start shrinking from day one.

EV Charging Points — Akshara Aditya Homes

EV Charging Points

EV-compatible charging in the parking — future-ready for the car you’ll drive next.

Dedicated Stilt Parking — Akshara Aditya Homes

Dedicated Stilt Parking

Secured, well-lit, EV-ready bays — every home gets its own dedicated space.

Gated 24/7 Security — Akshara Aditya Homes

Gated 24/7 Security

CCTV surveillance, watchman room and controlled entry for complete peace of mind.

Sewage Treatment Plant — Akshara Aditya Homes

Sewage Treatment Plant

An on-site STP by Sreshta EnviroTech — responsible water management, built in.

Location & Connectivity

Adibatla — inside the ORR, ahead of the curve.

Adibatla is south-east Hyderabad's fastest-rising address — inside the Outer Ring Road, 3.5 km from TCS Adibatla, 5.7 km from Wonderla, near the Ranga Reddy District Collectorate and a short drive from the Foxconn facility at Kongarakalan. IT parks, aerospace SEZs, schools, banks and hospitals are all in easy reach.

TCS Adibatla near Akshara Aditya Homes
3.5 km

TCS Adibatla

Foxconn, Kongarakalan near Akshara Aditya Homes
Short drive

Foxconn, Kongarakalan

Wonderla Amusement Park near Akshara Aditya Homes
5.7 km

Wonderla Amusement Park

Ranga Reddy District Collectorate near Akshara Aditya Homes
Close by

Ranga Reddy District Collectorate

Banks · Schools · Hospitals near Akshara Aditya Homes
Easy access

Banks · Schools · Hospitals

Survey No. 718, Plot No. 4, Aditya Nagar, Adibatla, Ranga Reddy District — LRS-approved plot · Open in Google Maps →

Construction Progress

Watch your home being built right.

Every stage photographed and dated. Every slab cast in M25 ready-mix and strength-certified before the next one rises.

Current status (June 2026): all five floors topped out — blockwork and finishing underway. Book now to choose your floor and customise finishes.
Oct 2024

Partnership & land agreement

The Akshara Aditya collaboration is signed — AINFRA with BNI Akshara partners, on an LRS-approved plot in Aditya Nagar.

Akshara Aditya Homes — Partnership & land agreement Akshara Aditya Homes — Partnership & land agreement
Jan 2025

TG-bPASS permit granted

Building permission 0001/BP/3131/2025 issued on 28 January 2025 under the Telangana Municipalities Act — the project team assembles.

Akshara Aditya Homes — TG-bPASS permit granted Akshara Aditya Homes — TG-bPASS permit granted
Feb 2025

Site mobilisation

Site office up, hoardings on, surveys done — Adibatla work front opens.

Akshara Aditya Homes — Site mobilisation
Mar 2025

Excavation & 10-ft footing pits

Deep excavation on tested soil; footing pits driven a full 10 feet down, the Subham way.

Akshara Aditya Homes — Excavation & 10-ft footing pits Akshara Aditya Homes — Excavation & 10-ft footing pits Akshara Aditya Homes — Excavation & 10-ft footing pits
Apr 2025

Footings & starter columns

Steel-reinforced footing bases cast in M25 ready-mix concrete; columns rise out of the ground.

Akshara Aditya Homes — Footings & starter columns Akshara Aditya Homes — Footings & starter columns Akshara Aditya Homes — Footings & starter columns
May 2025

Milestone pooja & stilt columns

A site blessing with partners and neighbours as the stilt-level columns complete.

Akshara Aditya Homes — Milestone pooja & stilt columns Akshara Aditya Homes — Milestone pooja & stilt columns Akshara Aditya Homes — Milestone pooja & stilt columns
Sep 2025

First slabs cast

Centring, reinforcement and miller-based M25 slab casting begin the floor-by-floor cycle.

Akshara Aditya Homes — First slabs cast Akshara Aditya Homes — First slabs cast Akshara Aditya Homes — First slabs cast Akshara Aditya Homes — First slabs cast
Oct–Nov 2025

Floor-by-floor progress

Slab after slab, each strength-tested and certified before the next — the community takes shape.

Akshara Aditya Homes — Floor-by-floor progress Akshara Aditya Homes — Floor-by-floor progress Akshara Aditya Homes — Floor-by-floor progress Akshara Aditya Homes — Floor-by-floor progress Akshara Aditya Homes — Floor-by-floor progress Akshara Aditya Homes — Floor-by-floor progress Akshara Aditya Homes — Floor-by-floor progress
Mar 2026

Structure tops out

All five floors stand. Ultrasonic pulse velocity and crush tests close out the structural phase.

Akshara Aditya Homes — Structure tops out Akshara Aditya Homes — Structure tops out
Jun 2026

Blockwork & finishing begin

CC-block walls and internal works underway — finishing, fittings and the rooftop garden come next.

Akshara Aditya Homes — Blockwork & finishing begin
M25
Ready-mix concrete, certified slab-wise
>25 N/mm²
Average crush-test results
SM Consultants
Independent quality certification
3-Year
Seepage & leakage warranty
Read the Subham Quality Promise Download Full Brochure (PDF)
📞 Call WhatsApp Brochure